Project Highlights
Below are a few of our current and past projects:
Click on the link or picture if you would like to learn more.
| Current Projects |
Queen Elizabeth Outdoor Pool in Kinsmen Park
Edmonton, AB
Budget: $4.0M
Completion: Spring 2010
The new Queen E Pool is tied to the landscape of Edmonton’s river valley. The building’s careful siting, pavilion like form, simple construction and materiality recall the rustic spirit of the original pool, and tie the new building into the landscape of the North Saskatchewan River valley park system...
Read more...
Centre for Physical Activity and Health, U of A
Edmonton, AB
Budget: n/a
Completion: Estimated 2010
This study, undertaken for the Faculty of Physical Education and Recreation at the University of Alberta, is a departure from previous programming exercises associated with the Van Vliet Centre as it approaches the complex problems of ...
Read more...
CLC, Community Learning Campus
Olds, AB
Budget: $58,000,000
Completion: Fall 2009
The Community Learning Campus (CLC) combine focus on students, the community, rural growth, and lifelong learning. The CLC sets a new standard for the sustainability of small communities...
Read more...
G. H. Dawe Community Centre
Location: Red Deer
Project budget: 29.97 million C
ompletion: Est August 2009
G.H. Dawe Community Centre Revitalization project includes 70,785 ft2 of renovation and a 36,577 ft2 addition. The Centre currently accommodates four partners, the City of Red Deer, Red Deer Public Library, ...
Read more...
Triffo Hall, U of A
Edmonton, AB
Budget: $5,400,000
Completion: October 2007
LEED® Gold Certified
Triffo Hall represents the rebirth of the existing South Lab, one of the oldest buildings on the University of Alberta North Campus, dating back to 1915. It provides an office complex and conference/classroom facility for the Faculty of Graduate Studies and Research and The Graduate Students’ Association.
Read more...
The Lemur Pavilion, Edmonton Valley Zoo
Edmonton, AB
Budget: $1,200,000
Completion: June 2007
Makira Outpost, the Valley Zoo Lemur Pavilion, was commissioned by the City of Edmonton to create a prosimian living environment housing four different types of lemurs year round. The space includes both indoor and outdoor exhibition areas with animal bridges providing regular access between them.
Read more...
Olds Agriculture Society
Olds, AB
Budget: $20,900,000
Completion: TBA
The proposed development is a consolidation of agricultural components such as riding arena, wash racks, warm up areas, existing calouri component composed of the convention centre...
Read more...
Red Deer College
Building Communities Through Learning
Red Deer, AB
Budget: $50,000,000
Completion: Spring 2009
Red Deer College is embarking on the largest growth project since they opened in 1964. BCTL, which includes the college’s planned expansion to better serve the education needs of Central Alberta...
Read more...
The Salvation Army Pine Lake Camp
Pine Lake, AB
Budget: n/a
Completion: Estimated 2007
Salvation Army requested a conceptual site plan study (including short term and long term goals) for their summer camp facility in Pine Lake, Alberta
Read more...
| Past Projects |
Jubilee Car Park, Edmonton
Edmonton, AB
Budget: $25.700,000
Completion: Fall 2008
The new Jubilee Car Park provides 735 parking stalls for the Jubilee Auditoria, University of Alberta and the University Hospital. Situated to the west of the Jubilee Auditoria, the car park addresses the displacement of surface stalls for the construction of the neighboring Edmonton Clinic. In addition to improving the overall patron experience at the ...
Read more ...
1st Choice Savings & Credit Union
Lethbridge, AB
Budget: $4,500,000
Completion: 2006
LEED® Silver Certified
The new 1,822m2 Fairmont Branch and Administrative Headquarters of 1st Choice Savings and Credit Union is the banking alternative for Southern Albertans, serving approximately 17,000 member-owners at six branches. This flagship project will ensure members and staff are provided with a long-lasting, sustainable development reflecting ...
Read more ...
Chinook Credit Union Strathmore Branch
Strathmore, AB
Budget: $3,500,000
Completion: 2006
Squeezed into a tiny storefront facility in Strathmore AB, Chinook Credit Union needed to expand their operations. Instead of selecting land close to the Trans-Canada highway, as many other commercial operations had, Chinook chose to remain ...
Read more ...
Collicutt Centre
Red Deer, AB
Budget: $21,147,290
Completion: 2001
The Collicutt Centre, situated in Red Deer, serves as the hub for Central Alberta’s recreational activities. People young and old enjoy the centre’s unique blend of amenities, both for competition training and general health and wellness...
Read more...
Confluence Campus
Rocky Mountain House, AB
Budget: $18,250,000
Completion: October 2005
Educational Success: Integration of the three educational facilities, a Public high school, a Catholic high school, and a post-secondary campus. The facility allows the community unique access to a variety of ...
Read more...
One River Park
Edmonton, AB
Budget: n/a
Completion: Winter 2005
This luxury condominium, situated on Saskatchewan Drive, capitalizes on the prestigious views to both the downtown and river valley. The project consists of 36 units ranging in size from 1300-5600sq. ft. with ...
Read more...
Red Deer Regional Hospital
Red Deer, AB
Budget: $106,104,700
Completion: December 2005
Serving a population of 300,000, the hospital provides critical medical services and employs 2,600. This project was a redevelopment of the entire hospital site that included the demolition of three buildings, redeveloped parking layouts and access roads, and the construction of three new building complexes attached to the existing hospital...
Read more...












